Here are some late post about the progress in my construction site.

Slump test is done to determine the concrete's workability.


Test cubes are prepared to determine the concrete strength after 7 and 28 days.


Water proofing material is applied to the Chiller roof slab.


Floor screeding work is done to TNB substation roof slab.


Tower Crane Installation

Foundation of the Tower Crane



The 45 tonnes mobile crane is lifting the tower mast.


The mechanics are fixing the operator's cab.


The crane runway is installed.