Week 6(10/5/2010 - 15/5/2010)


Construction Safety Policy



Rubbish chute installation


Safety access to enter the tower block


Scaffoldings are erected surrounding the tower block and they are covered with netting to avoid human, rubbish and debris from falling out.



Scaffolding tag


Temporary staircase for the workers climb up to higher level


Mon(10-5-2010)

Today, a hydraulic breaker comes to the site to demolish the existing structures(pilecaps & beams). The body of this hydraulic breaker is same as escavator but the bucket is replaced with a breaker.