Sunday, June 6, 2010

Week 9 (31/5/2010 - 4/6/2010)


Brick Wall Lintel



First, the worker drilled 4 small holes to the beam. Then, stiffeners are installed into the holes and grouted with Hilti Hit.


Reinforcement work is done to the lintel.


Next, formwork is installed.


Concrete casting is done to the lintel.


The finished lintel

No comments:

Post a Comment